Emerson 5081-P-FF/FI Installation, Unpacking And Inspection, Rotating The Display

Models: 5081-P-FF/FI

1 28
Download 28 pages 24.89 Kb
Page 6
Image 6
INSTALLATION

MODEL 5081-P-FF/FI

INSTALLATION

INSTALLATION

UNPACKING AND INSPECTION

Inspect the shipping container. If it is damaged, contact the shipper immediately for instructions. Save the box. If there is no apparent damage, unpack the container. Be sure all items shown on the packing list are present. If items are missing, notify Rosemount Analytical immediately.

ROTATING THE DISPLAY

The 5081-P-FF/FI display can be rotated 90° left or right. Disengage the cover lock and remove the front cover. Remove the three screws holding the PCB stack and gen- tly lift the display board. Do not disengage the ribbon cable between the display board and the CPU board. Rotate the display. The black infrared sensor will be at the top of the display.

INSTALLATION

See Figure 6.

1.Although the analyzer is suitable for outdoor use, do not install it in direct sunlight or in areas of extreme temper- atures.

2.Install the analyzer in an area where vibrations and elec- tromagnetic and radio frequency interference are mini- mized or absent.

3.Keep the analyzer and sensor wiring at least one foot from high voltage conductors. Be sure there is easy access to the analyzer.

4.The conduit connections on the sides of the 5081-P housing should be sealed to prevent moisture from entering the enclosure.

5.The transmitter must not be mounted with both conduit openings at the top.

MILLIMETER

INCH

FIGURE 6. Mounting Model 5081-P-FF/FI

6

Page 6
Image 6
Emerson instruction sheet Installation, Unpacking And Inspection, Rotating The Display, Mounting Model 5081-P-FF/FI