Installing the Harsh Environment
UPS System
After the UPS system is unpacked and moved to the final installation location, the UPS and Environmental Cabinets are ready to be joined. Once the cabinets are joined, internal and external wiring is installed. Figure 4 shows the UPS and Environmental cabinets assembled. The top view shows the cable entry plate in the Environmental cabinet.
TOP VIEW
FRONT VIEW
Figure 4. UPS and Environmental Cabinets
Powerware BPIII Harsh Environment UPS | 13 |
164201261 Rev. F 111503