(ON COMMUNICATIONS
PANEL OF THE UPS)
TB1 TB2
Figure 15. Wiring an SCM to the UPS
4.Connect the SCM wiring to the terminal block using the terminations shown in Table F.
5.Contact your local field service office for verification and testing of the SCM and its connections prior to making connections to terminal strip shown in Figure 16.
6.Repeat steps 1 through 5 for each SCM you are installing.
7.If you are installing an RMP or RIM in addition to an SCM, proceed to Chapter 4 or 5, respectively; otherwise, secure the UPS cabinet by reversing the steps contained in procedure “To Prepare the UPS for Wiring to an RMP, RIM, SCM, or Remote EPO” of Chapter 2.
| Table F. Supervisory Contact Module Wire Terminations |
|
| ||
|
|
|
|
|
|
| From SCM A | To UPS | Remarks |
|
|
|
|
|
|
|
|
| TWISTED WIRES (4) |
|
| ||
|
|
|
|
| |
|
|
| |||
|
|
| |||
|
|
| 3 INCHES |
|
|
|
|
| |||
|
|
|
| ||
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
| From SCM B (if used) | To UPS | Remarks |
|
|
|
|
|
|
|
|
| TWISTED WIRES (4) |
|
| ||
|
|
|
|
| |
|
|
| |||
|
|
| |||
|
|
| 3 INCHES |
|
|
|
|
| |||
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
Powerware BPIII Harsh Environment UPS | 35 |