Installation Checklist

-All packing materials and restraints have been removed from each cabinet. -Each cabinet in the UPS system is placed in its installed location.

-All cabinets are bolted together.

-A ground bond is installed between all cabinets that are bolted together. -All switchboards, conduits, and cables are properly routed to the UPS. -Power cables are terminated on AC Input terminals (UPS Cabinet) (E1---E3).

-Power cables are terminated on Bypass Transformer input terminals (UPS Cabinet) (E13---E15).

-Power cables are terminated on AC Output terminals (UPS Cabinet) (E9---E12). -Power cables are terminated on DC Input terminals (UPS Cabinet) (E4---E5). -Power cables are terminated on bypass terminals (E19---E21).

-Power cables are terminated on the CB1 input breaker (E33---E35 ). -Power cables are terminated on output terminals (E25---E27).

-A ground conductor is properly installed.

-If N is used, no other N---G bonds exist downstream from the UPS.

-Battery cables and harness are terminated on the CB2 battery breaker E31 and E32.

-The area around the installed UPS system is clean and dust-free. (It is recommended that the UPS be installed on a sealed concrete pad on a sealed concrete floor.)

-Adequate workspace exists around the UPS and other cabinets. -Adequate lighting is provided around all UPS equipment.

-A 120V service outlet is located within 25 feet of the UPS equipment.