Manuals
/
Emerson
/
Lawn and Garden
/
Weather Radio
Emerson
PN-51-T56 instruction manual Clarity II T56, This page left blank intentionally
Models:
PN-51-T56
1
2
44
44
Download
44 pages
63.47 Kb
1
2
3
4
5
6
7
8
<
>
Specifications
Install
List of Replacement Parts
Warranty
Maintenance
Configuring and Ranging the Current Outputs
Signal board terminal blocks 26-16 AWG wire size
Resetting Factory Default Settings
Fault and Warning banner
Removable connectors and signal input boards
Page 2
Image 2
Instruction Manual
Clarity II T56
PN-51-T56
May 2012
This page left blank intentionally
Page 1
Page 3
Page 2
Image 2
Page 1
Page 3
Contents
Clarity II T56 Turbidimeter
This page left blank intentionally
Clarity II T56
PN-51-T56
ESSENTIAL INSTRUCTIONS-Read this page before proceeding
RISK OF ELECTRICAL SHOCK
Clarity II T56 Turbidimeter
Clarity II T56
Date
About This Document
Rev. Level
Section 2 Installation
Contents
Section 1 Description and Specifications
Section 3 Wiring
Section 6 Programming - Turbidity
Table of Contents cont’d
Section 8 Maintenance
Section 7 Calibration
Section 1 Description and Specifications
1.1 Features and Applications
1.2 Specifications - General
Real time clock back-up 24 hours Hazardous Location Approvals
Current output connectors 26-16 AWG wire size
Power Input
Signal board terminal blocks 26-16 AWG wire size
Alarm relay terminal blocks 24-12 AWG wire size
Clarity II T56
1.3 Ordering Information
Accessories
T56 Turbidity System Components
2.1 Unpacking and Inspection
Section 2.0 - Installation
2.2 Installation
2.2.1 General Information
Installation
Fig. 2-1 T56 Panel Mounting Installation dimensions
PANEL MOUNT
Clarity II T56
4X COVER SCREW WALL / SURFACE M OUNT
Fig. 2-2 T56 Pipe and Wall Mounting Installation dimensions
WALL / SURFACE MOUNT
PIPE MOUNT
function of flow 0.040 inch outlet orifice
2.3 Installation - Debubbler Assembly
TABLE 2-1. Approximate debubbler pressure as a
psig
Clarity II T56
Fig. 2-3 Debubbler and Flow Chamber
Installation
PN-51-T56
2.4 Installation - Sensor
Fig. 2-4 Sensor
3.1.2. Signal input boards
Section 3.0 Wiring
3.1.1. Removable connectors and signal input boards
3.1.4 Alarm relays
3.4.2 Current output wiring
3.4 Power, Output, and Sensor Connections
3.4.1 Power wiring
3.4.3 Alarm relay wiring
RISK OF ELECTRICAL SHOCK
3.4.4 Sensor wiring to signal boards
3.4.5 Sensor
Fig. 3-1 Turbidity signal board with plug-in Sensor connection
IMPORTANT NOTE
4.2 Instrument Keypad
Section 4.0 Display and Operation
4.1 User Interface
Function keys
Alpha-numeric Keypad
4.3 Main Display
Navigation Keys
Process Measurements
Fault and Warning banner
4.4 Menu System
This page left blank intentionally
Clarity II T56
PN-51-T56
Section 5.0. Programming the Analyzer - Basics
5.2 Configuring and Ranging the Current Outputs
5.3 Setting a Security Code
5.1 General
5.6 Resetting Factory Default Settings
5.4 Security Access
5.5 Using Hold
5.7 Programming Alarm Relays
repeated alarm activation and press ENTER/MENU
6.2 Turbidity Measurement Programming
Section 6.0 Programming - Turbidity
6.1 Programming Measurements - Introduction
This page left blank intentionally
Clarity II T56
PN-51-T56
7.2 Turbidity
Section 7.0 Calibration
7.1 Calibration - Introduction
7.2.3 Grab Calibration - Turbidity
7.2.1 Slope Calibration - Turbidity
7.2.2 Standardize Calibration - Turbidity
Calibration
Do not use abrasive cleaners or solvents
Section 8.0 Maintenance
8.2.1 Cleaning the sensor
8.1 Overview
Fig. 8-1 Replacing the Lamp/LED Board
Step Step Step
8.3 Debubbler and Measuring Chamber
8.3.1 Cleaning the sensor
8.3.2 Cleaning the orifice
Clarity II T56
8.4 List of Replacement Parts
Fig. 3-2 Molded Debubbler Assembly
LOCATION IN
Section 9.0 Return of Material
9.2 Warranty Repair
9.3 Non-Warranty Repair
9.1 General
Appendix
Volume of
Volume for
Dilution
WARRANTY
RETURN OF MATERIAL
Certification
Clarity II T56
PN-51-T56
Certification
Clarity II T56
PN-51-T56
This page left blank intentionally
Clarity II T56
PN-51-T56
This page left blank intentionally
Clarity II T56
PN-51-T56
ON-LINE ORDERING NOW AVAILABLE ON OUR WEB SITE
Specifications subject to change without notice
The right people, the right answers, right now
Emerson Process Management