25613-0-0309 Page 35
NOTE: Termination cap should pass through the wall restop
from the exterior of the building. Adjust the termination
cap to its nal exterior position on the building.
Warning: Termination cap must be positioned so that arrow
is pointing up.
Attach the termination cap with the four wood screws provided.
Before attachment of the termination, run a bead of silicone sealant
rated above 250°F on its outside edge too, so as to make a seal to
the exterior wall.
NOTE: Wood screws can and should be replaced with appropriate
fasteners for use on stucco, brick, concrete or other types
of siding.
CAUTION: If exterior walls are nished with vinyl siding, (or
materials that could become discolored or warp) it is necessary to
install a vinyl siding standoff.
The vinyl siding standoff will be installed between the vent
termination and the exterior wall. See Figure 54. This horizontal vent
termination bolts onto the at portion of the vinyl siding standoff, so
an air space will exist between the wall and the termination cap.
BOLT(4REQUIRED)
VENTTERMINATION
WOODSCREWS (4 REQUIRED)
NUT
(4REQUIRED)
CUTVINYL SIDING AWAY
TOFIT STANDOFF
Figure 54
HORIZONTAL TERMINATION