INSPEED™ SAN STORAGE SWITCH MODEL 355 CHAPTER 2 SWITCH INSTALLATION
USERS GUIDE
6
CHAPTER 2SWITCH INSTALLATION
INSTALLATION PREPARATION
After receiving the switch, perform the following steps to ensure the switch and other contents arrived
safely.
To unpack the switch:
1. Inspect the outer shipping container for any damage that may have occurred in shipping. Report
any sign of damage to the appropriate shipping agency.
2. Remove the switch and cables from the shipping container; save the shipping container, foam,
and antistatic bags—returning the switch in any other container is not advised.
Make sure the following parts are included:
Switch unit
RS-232 null-modem serial cable
Power cable
Self-adhesive pads (4)
InSpeed™ SAN Storage Switch Model 355 Quick Install Card
Product Release Notes
Safety and Regulatory Guide
Additional documentation, including warranty information and the End User License
Agreement.
3. Inspect the switch thoroughly. (If any signs of damage are seen, notify a sales representative
and/or the shipping agency.)
Installation Preparation................................................ 6
Switch Installation........................................................7
Switch LEDs ................................................................9
SFP Compatibility ......................................................11
Booting the Switch and SAN......................................12