Z8 Encore!® Flash Microcontroller Development Kit
User Manual
9
UM014605-0208 Installation
Getting Started

Using ZDS II

Follow the steps below to open an existing project:
1. Connect the Evaluation board to the host PC’s serial communications
port using the Smart Cable.
2. Apply 9 V DC power to the Evaluation board.
3. Run the ZDS II Software (Start > Programs > ZDS II-Z8
Encore! F640x_<Version>ZDS II-28 Encore!
F640x_<Version>).
4. Select Open Project from the File menu. The Open Project dialog
box appears.
5. Select samples. The samples folder appears.
6. Select the Z8F640x_ledBlink folder and then the src folder to
access the ledBlink.pro project file.
7. Select the ledblink.pro file. The initial ZDS II program screen
opens.
8. Click Rebuild All and then the Reset icon to
connect and download the code to the Evaluation board.
9. Click Go icon to start the program.
For more information, refer to Zilog Developer Studio II—Z8 Encore®
User Manual (UM0130), supplied with the documentation on the CD-
ROM or available for download at www.zilog.com.