Enviro 50-1578 technical manual Through Wall with Horizontal Termination

Models: 50-1578

1 31
Download 31 pages 25.38 Kb
Page 13
Image 13

Installation

VERTICAL RISE WITH HORIZONTAL TERMINATION INSTALLATION (RECOMMENDED):

A 45° elbow with a rodent screen may be used in place of the termination cap (or stainless steel termination hood).

Termination cap

 

90°elbow

 

Wall framing

 

Vertical section

 

of vent pipe

Wall strap

 

Horizontal frame

 

for thimble

 

 

Clean out tee

 

Wall thimble

������ �������

 

Figure 11: Through Wall with Horizontal Termination.

THROUGH CONCRETE WALL WITH VERTICAL RISE INSTALLATIONS:

A 45° down elbow with a rodent screen may be used in place of the termination cap (or stainless steel termination hood).

Installation to use if there is a concrete or retaining wall in line with exhaust vent on pellet stove.

The termination must be 305mm (12”) from the outside wall and 305mm (12”) above the ground.

Horizontal frame

 

for thimble

Termination

Wall thimble

cap

 

90°elbow

 

Wall framing

 

Vertical section

 

of vent pipe

 

 

Concrete

 

Wall

������ �������

Clean out tee

Figure 12: Vertical rise with Horizontal Termination.

13

Page 13
Image 13
Enviro 50-1578 technical manual Through Wall with Horizontal Termination