Enviro C-10381, C-11290 owner manual Initial Installation, Qualified Installers Only

Models: C-10381 C-11290

1 48
Download 48 pages 53.55 Kb
Page 24
Image 24
1.Follow installation steps 1 & 2 under Initial

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 34: Multi-Story Vent Pipe Installation.

Figure 33: Use of Wall Straps.

Cathedral Ceiling Installation:

1.Follow installation steps 1 & 2 under Initial

Installation - Vertical Installation.

2.Using the plumb bob, mark the centerline of the venting system on the ceiling and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the “Cathedral Ceiling Support Box”.

3.Remove shingles or other roof coverings as necessary to cut the rectangular hole for the “Support Box”. Cut the hole ⅛” larger than the “Support Box” outline.

4.Lower the “Support Box” through the hole in the roof until the bottom of the “Support Box” protrudes at least 2 inches (5 cm) below the ceiling. Align the “Support Box” both vertically and horizontally with a level as shown in Figure 35. Temporarily tack the “Support Box” in the place through the inside walls and into the roof sheathing.

Figure 35: Cathedral Ceiling Support Box Leveling.

24

Page 24
Image 24
Enviro C-10381, C-11290 Initial Installation, Qualified Installers Only, Follow installation steps 1 & 2 under Initial