Extron electronic PVS 400, PVS 200, PVS 300 Installation - Stage Five, cont’d, Test the system

Models: PVS 300 PVS 400 PVS 200

1 46
Download 46 pages 60.91 Kb
Page 40
Image 40
Installation — Stage Five, cont’d

Installation — Stage Five, cont’d

2.Test the system

a.Ensure power is supplied to the PVS 204SA switcher, and power on the MLC 104 IP Plus.

b.Connect all the input devices (e.g., PC, DVD, document camera, etc.) to the transmitters and power up the input devices. Check that power and signal are present at the transmitters. The LEDs light red when only power is present and light green when power and a signal are present.

c.Power on the projector and with a video source (PC or DVD playing) check that a good image is shown on screen.

Adjust projector settings as follows:

Adjust the rotation (yaw) by turning the unit on the projector pole. Secure the location by tightening the two set screws on the UPB mount plate to the pole

(see below).

Loosen all pivot screws and adjust the vertical angle

(pitch) of the projector. Lock down the four adjustment screws.

Adjust the horizontal tilt (roll) of the projector. Lock down all the remaining adjustment and pivot screws.

Adjust the image settings on the projector (zoom, focus, keystone, brightness, contrast, etc.). Refer to the manufacturer’s user manual.

2a Turn on the MLC 104 IP Plus controller and the PVS 204Sa switcher

2b Connect and turn on the input devices

Vertical

Angle Adjustment

and Pivot

Point Screws

Horizontal Angle

Adjustment and

Pivot Point Screws

2.Test the systemTighten these 2 set screws 2a Turn on the MLC 104 IP Plus controller and the PVS 204Sa switcher(one each side) to lock the 2b Connect and turn on the input devices UPB onto the pole.

Pitch/Vertical Angle

Yaw/RotationRoll/Tilt

Adjuster 2c Check that an image is present, adjust as needed.2-28 PoleVault Systems Installation • Installation — Stage 5Manual backgroundManual backgroundManual backgroundManual background Plate Locking Screws (4)

2c Check that an image is present, adjust as needed.

2-28 PoleVault Systems Installation • Installation — Stage 5
Page 40
Image 40
Extron electronic PVS 400 Installation - Stage Five, cont’d, Test the system, 2b Connect and turn on the input devices