Installation Overview

Installation Overview

This overview outlines the basic steps for installing the PoleVault System. Detailed description of these steps is given in five sections, Stages One though Five.

NAdditional installation hardware is needed and should be supplied by the installer. See Introduction, “Items not included”, for a list.

Optional accessories may be desired for this installation. See Introduction, “Optional items”, for a list, or visit www.extron.com for details.

Refer to local building standards and codes to verify that the installation will meet all the regulatory requirements. Observe all local and national building and safety codes, UL requirements, and ADA Accessibility Guidelines.

For details of the OSHPD approved method of installation (OPA-1782), consult the PCM 240 User’s Manual, 68-1180-01, Rev D.

Refer to the specifications on pages 2-31 through 2-33 for system hardware weights and dimensions.

Carefully check inventory of PoleVault system packages, input and output devices, any optional accessories, and installation hardware before commencing.

Outline of installation steps

Stage One — Install the Screen and Projector.

cMark the screen location (page 2-3).

cInstall projector to verify location (page 2-3).

cVerify the image location (page 2-4).

cCut the ceiling tile (page 2-5).

cFinish projector ceiling mount installation (page 2-5).

cSecure the projector ceiling mount to the ceiling (page 2-6).

cInstall the screen (page 2-7).

Stage Two — Install the A/V Source Input Wall Plates and MLC 104 IP Plus.

cInstall the mud rings (page 2-10).

cPull cables (page 2-11).

cInstall the wall plates (page 2-12).

cInstall the MediaLink Controller (page 2-13).

Stage Three — Install the PV SI 3C LP Ceiling Speakers.

cCut the ceiling tile (page 2-17).

cInstall the speaker in the ceiling tile (page 2-17).

cSecure the speakers to the structural ceiling (page 2-18).

cCable the speakers (page 2-18).

cFinish speaker installation (page 2-20).

Stage Four — Install the PMK 450 and the PVS 204SA.

cPull the cables (page 2-22).

cInstall the PMK 450 pole mount kit (page 2-22).

cInstall the PVS 204SA switcher (page 2-23).

cFinish installing the pole mount kit (page 2-24).

Stage Five — Configuring the system.

cConfigure the system (page 2-26).

cTest the system (page 2-28).

cFinal installation (page 2-29).

Where possible in the following pages, line drawings and photos from an actual installation are used to clarify some of the steps discussed in the text. Each image has a number corresponding to the particular step (e.g., Ñ) described.

PoleVault Systems Installation • Installation Overview

2-1

Page 13
Image 13
Extron electronic PVS 400 manual Installation Overview, Outline of installation steps, Stage Five - Configuring the system