Included Parts
Description
Part Number
VNR 100 Recorder | |
|
|
Rack mounting kit |
|
VNR 100 Setup Guide
Mounting the VNR 100
This section provides information on installing the VNR 100 into a rack cabinet. Rack installation requires the use of the provided rack mount kit.
UL Guidelines for Rack Mounting
The following Underwriters Laboratories (UL) guidelines are relevant to the safe installation of these products in a rack:
1.Elevated operating ambient temperature — If the unit is installed in a closed or
2.Reduced air flow — Install the equipment in the rack so that the equipment gets adequate air flow for safe operation.
3.Mechanical loading — Mount the equipment in the rack so that uneven mechanical loading does not create a hazardous condition.
4.Circuit overloading — Connect the equipment to the supply circuit and consider the effect that circuit overloading might have on overcurrent protection and supply wiring. Consider the equipment nameplate ratings when addressing this concern.
5.Reliable earthing (grounding) — Maintain reliable grounding of
Rack Mounting Using Rack Rails
The rack mounting kit is used to mount the VNR 100 in a Telco rack or a standard 19 inch (48.3 cm) wide rack with four vertical posts, one in each corner.
ATTENTION:
•When multiple units are mounted in the rack, load the rack from the bottom to the top, with the heaviest unit at the bottom.
•If this is the only unit mounted in the rack, it should be mounted at the bottom.
•With the rack rails collapsed, this unit requires a minimum rack depth of 25.5 inches (64.8 cm).
•The total room required with the rack rails fully expanded, is 33.5 inches (85.1 cm).
VNR 100 • Reference Information 22