Frymaster HLZ 18, HLZ 22 service manual Heated Landing Zone, Installation/Setup, Operation

Models: HLZ 18 HLZ 22

1 20
Download 20 pages 22.58 Kb
Page 5
Image 5
3. HEATED LANDING ZONE

3. HEATED LANDING ZONE

The Heated Landing Zone or HLZ is designed to hold assembled sandwiches. By circulating heated air evenly across the open staging area, the Heated Landing Zone keeps sandwiches hot without drying or cooking. The Heated Landing Zone meets all McDonald’s standards for safety, efficiency, food safety, and cleanliness.

4. INSTALLATION/SETUP

Upon arrival, inspect the HLZ for concealed damage. Immediately report any damage to the delivering freight company. Claims must be filed within 15 days after receipt of the unit.

Make sure that the unit is placed on an even surface and that the area surrounding the HLZ is free of clutter that would interfere with air flow.

Optional Burger Bumper

Installed (unit built before 10/98)4. INSTALLATION/SETUP

ComputerFigure 1

Cowl

Figure 1

INSTALL OPTIONAL BURGER BUMPER (Units built before 10/98)

The burger bumper may be placed on either side of the HLZ to prevent pass through of product. Burger bumpers are provided by the KES. See figure 1.

INSTALL FILTER SCREEN (Units built after 10/98)

The filter screen is design to prevent debris from entering the Computer Cowl Assembly and clogging the blower assembly. Simply fit the part on to the vent opening of the computer cowl assembly. The filter screen will snap into position. If equipped with an optional holding screw, tighten screw to pull the filter screen snug into position.

POWER REQUIREMENTS:

Voltage – Two models are available: 208 VAC and 240 VAC*

Frequency - 60 Hz

Single Phase

20 amp Service

The filter screen snaps into place on rear of the air-intake tower.

*If the 240 VAC model is operated on 208 VAC, the unit will heat slowly and may not reach maximum temperature. If the 208 VAC model is operated on 240 VAC, component damage is probable. To ensure proper operation, the power source should match the voltage on the rating plate on the bottom of the HLZ.

5. OPERATION

1.Plug the unit into the power source.*

2.See “HLZ COMPUTER OPERATION AND PROGRAMMING, Section 7” for proper setup and operation of the computer.

3.Place product in the HLZ in accordance with the restaurant’s established procedures.

THIS APPLIANCE IS EQUIPPED WITH A GROUNDING PLUG FOR YOUR PROTECTION AGAINST SHOCK HAZARD AND MUST BE PLUGGED INTO A PROPERLY GROUNDED RECEPTACLE. DO NOT CUT OR REMOVE THE GROUNDING PRONG FROM THIS PLUG.

4.CLOSING - When closing the store, remove all product from the HLZ and perform daily preventive maintenance in accordance with the MRC. Turn the computer OFF.

Frymaster L.L.C., 8700 Line Avenue 71106, P.O. Box 51000, Shreveport, Louisiana 71135-1000

318-865-1711 FAX 318-862-2394

Printed in the United States

Service Hotline

Page 3

 

1-800-24-FRYER

 

Page 5
Image 5
Frymaster HLZ 18, HLZ 22 service manual Heated Landing Zone, Installation/Setup, Operation