Frymaster M2000 Clean area behind fryers, Weekly FR 2 W1, Shut off and disconnect gas

Models: M2000

1 26
Download 26 pages 43.15 Kb
Page 3
Image 3
Clean area behind fryers

 

Clean area behind fryers

 

 

 

Weekly

 

 

 

FR 2 W1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Why

To ensure high-quality fried products and reduce the possibility of a fire near the fryer

 

 

 

Time required

5 minutes to prepare

45 minutes to complete

 

 

 

Time of day

After close

For 24-hour restaurants: overnight or during low-

volume periods

Hazard icons

Tools and supplies

Brush, hi-lo deck

Brush, pot, nylon

Bucket with McD All

Bucket, clean and

Bucket, soiled towels

Caution Wet Floor

Mop

 

 

Purpose Super

sanitized towels

 

Sign

 

 

 

Concentrate (APSC)

 

 

 

 

 

 

solution

 

 

 

 

Mop bucket

Mop wringer

Oil removal cart

Paper towels

Putty knife

Neoprene Gloves

Frymaster Fryer Models Using Model M2000 Computer

Procedure

1Turn fryers off.

Turn all fryer power switches to the off position.

2Remove and empty grease trough and cup.

Remove the grease trough from the exhaust hood. Re- move the grease cup from the hood. The trough and cup are located beneath the hood fil- ters. Pour any oil in the trough and cup into the oil removal cart.

Oil in trough and cup may be hot. Use gloves.

3Shut off and disconnect gas.

If the fryer is not a gas fryer, skip this step.

If the fryer is a gas fryer, use the manual gas shut-off valve to shut off the gas supply. The manual gas shut-off valve is located on the supply line before the quick disconnects. Then disconnect the gas line from the fryer via the quick disconnect.

Use only the manual shut-off valve to shut off the gas. Do not use the quick disconnects.

Manual shut-off

Weekly

FR 2 W1

©McDonald’s Corporation · Planned Maintenance Manual · Revised June 2008

Page 1 of 4

Page 3
Image 3
Frymaster manual Clean area behind fryers, Frymaster Fryer Models Using Model M2000 Computer, Weekly FR 2 W1