4. INCORPORATION OF DGPS BEACON RECEIVER KIT (for GP-1850W)

9.Connect J1 of GR-7000A to J8 of ANLG board (Refer to previous page).

10.Mount chassis assembly on the panel assembly. Connect 8P connector and 6P connector to Main board as shown in the figure below.

Attaching chassis assembly

11. Reassemble the display unit.

Remounting the cover

20

Page 28
Image 28
Furuno GP-1850WD installation manual Attaching chassis assembly, Remounting the cover