
TABLE OF CONTENTS
FOREWORD | v | ||
SYSTEM CONFIGURATION | vi | ||
1. | MOUNTING | 1 | |
| 1.1 | Equipment List | 1 |
| 1.2 | Mounting Procedure | 1 |
2. | WIRING | 2 | |
3. | ADJUSTMENTS | 4 | |
| 3.1 | LEDs and Equipment Status | 4 |
| 3.2 | Setting Up NMEA Ports | 5 |
| 3.3 | Heading, Pitch and Roll Offsets | 8 |
4. | OPERATION | 9 | |
5. | MAINTENANCE, TROUBLESHOOTING | 10 | |
| 5.1 | Preventive Maintenance | 10 |
| 5.2 | Replacing the Fuse | 11 |
| 5.3 | Troubleshooting | 11 |
| 5.4 | Self Test | 12 |
| 5.5 | Memory Clear | 13 |
SPECIFICATIONS | |||
OUTLINE DRAWING | |||
INTERCONNECTION DIAGRAM |
iv