Gardena C 1060 profi manual Putting Your Water Computer into Operation

Models: C 1060 profi

1 18
Download 18 pages 52.26 Kb
Page 5
Image 5
4. Putting Your Water Computer into Operation

GB

4. Putting Your Water Computer into Operation

Connect Water Computer:

The Water Computer is fitted with a sleeve nut L for taps with G 1(33.3 mm) thread. The adaptor supplied K allows the Water Computer to be connected to taps with a G 3/4thread

GB

Insert battery:

H

This Water Computer must only be powered by a 9 V alkaline manganese (alkaline) battery type IEC 6LR61.

1. Press unlock button H and pull control

 

unit I out of the Water Computer housing.

I

2. Insert battery J into battery compartment.

Ensure that the battery polarity P is correct.

The display shows all the LCD-symbols for 2 seconds and then moves to the time / day of week level.

3.

Re-insert control unit I in housing.

zD

Programming aid:

vStick the self-adhesive programming aid on the inside of the display cover D .

K

L

M

(26.5 mm).

Connect Water Computer to water tap with G 1(33.3 mm) thread:

1.Screw sleeve nut L of the Water Computer on to the tap thread by hand (do not use pliers).

2.Screw tap connector M on to the Water Computer.

Connect Water Computer to tap with G 3/4” (26.5 mm) thread:

1.Screw adaptor K on to the tap manually (do not use pliers).

2.Screw sleeve nut L of the Water Computer on to the adaptor thread K by hand (do not use pliers).

3.Screw tap connector M on to the Water Computer.

The display cover can be folded up to protect the display against the weather.

Compile watering plan: Before you start entering the watering data in the computer we recommend that you write the data on one of the watering plans in the appendix to maintain more of an overview.

J

zP

8

9

Page 5
Image 5
Gardena C 1060 profi manual Putting Your Water Computer into Operation