2.3.3Mounting Rack Installation

Remove the unit from the mounting tray by unscrewing the 3/32" hex-head screw that is near the left edge of the unit. Carefully slide the unit free of the tray. Set the unit aside in a safe location until needed. Install the tray using six FHP 6-32 x ½" screws. The unit must be supported at front and rear of the mounting tray. See Appendix B.

6.31”

2.00”

Figure 2-1 Typical Tray Installation Location

The tray mounting can be made in any area that exists for adding additional avionics. Instrument panel mounting is accomplished in accordance with AC 43.13-2A, Chapter 2.

Existing Structure (from behind

panel)

Avionics Mounting Rails

Factory Avionics Location

Factory Avionics Mounting Rails

Center Avionics Stack

Existing Transponder

Figure 2-2 Avionics Mounting Rails (Typical)

200-800-0101

Page 2-2