
CHAPTER 2: Getting Started
Preparing the site and host server
Important
The
Before you begin, make sure that the site where you intend to set up and use your storage system has the following:
•Standard AC power from an independent source or a rack power distribution unit with a UPS (universal power supply).
•A host computer with a standard Fibre Channel HBA (host bus adapter) with the latest BIOS and drivers. Follow the instructions provided with your HBA and install the HBA and its driver software, if necessary.
Unpacking the enclosure system
The package contents and unpacking procedure are outlined in the following illustration.
The accessory box contains the AC power cord(s), a serial communication cord, and the software and the Gateway External Storage CD (ESCD). The accessory box insert contains the adjustable rail slides and hardware parts to rack mount the enclosure.
18