GE 28, 30 owner manual Route the Copper Tubing and Connect It to the Shutoff Valve

Models: 28, 30

1 136
Download 136 pages 32.74 Kb
Page 35
Image 35
Route the Copper Tubing and Connect It to the Shutoff Valve

Route the Copper Tubing and Connect It to the Shutoff Valve

Route the copper tubing between the cold water line and the refrigerator.

Route the tubing through a hole drilled in the wall or floor (behind the refrigerator or adjacent base cabinet) as close to the wall as possible.

Be sure there is sufficient extra tubing [about 8 feet (244 cm) coiled into 3 turns of about 10(25 cm) diameter] to allow the refrigerator to move out from the wall after installation.

Place the compression nut and ferrule (sleeve) onto the end of the tubing and connect it to the shutoff valve.

Make sure the tubing is fully inserted into the valve. Tighten the compression nut securely.

Saddle-Type Shutoff Valve

Compression Nut

Packing

Nut

Ferrule (sleeve)

Outlet Valve

Turn On the Water and Flush Out the Tubing

1

Turn the main water supply on and flush out the tubing until the water

is clear.

 

2 Shut the water off at the water valve after about one quart (1 L) of water has been flushed through the tubing.

Safety Information Operating Instructions Installation Instructions Troubleshooting Tips Customer Service

35

Page 35
Image 35
GE 28, 30 Route the Copper Tubing and Connect It to the Shutoff Valve, Turn On the Water and Flush Out the Tubing