Installation Instructions

7

REPLACE THE BASE GRILLE

Replace the grille by installing the two Phillips head screws.

9START THE ICEMAKER

Set the icemaker power switch to the ON position. The icemaker will not begin to operate until it reaches its operating temperature

of 15°F (–9°C) or below. It will then begin operation automatically. It will take 2–3 days to fill the ice bin.

Power switch

8

SET THE CONTROLS

Set the controls to the recommended setting.

29

Page 29
Image 29
GE 200D8074P046 Replace the Base Grille, Start the Icemaker, SET the Controls, Set the controls to the recommended setting