BINARY

INPUT

MODULE

FLOW

SWITCH

PFA

TUBING

STAINLESS

STEEL

TUBING

FIGURE ONE: Flow Switch Kit

4.Mechanical installation

Refer to Figures One or Two for this procedure. Reference will depend on orientation of tubing from regulator.)

4.1.Remove the outlet PFA tube connector from the pressure regulator of the analyzer.

4.2.Detach the regulator from the analyzer by removing the two screws on the bottom of the mounting bracket making sure not to lose the fiber spacers.

4.3.Remove the elbow from the outlet side of the regulator and clean the port and connector threads of any Teflontape remains. Reapply 4 wraps of Teflon tape to the elbow and screw the fitting back into the regulator ending with the tube fitting pointing down as shown.

4.4.Reinstall the regulator to the analyzer with the two screws making sure to use the fiber spacers.

4.5.Remove the PFA tube from the inlet of the sampling block.

4.6.Position the flow switch and secure the end of the stainless steel U-tube to the regulator outlet. Wires must point up to have a calibrated normally open switch.

4.7.Secure the PFA tube from the outlet of the switch to the inlet of the sampling block.

4.8.Connect the wires from the flow switch to the Binary Input Module, polarity not important to the binary module.

4.9.Route the electrical cable as desired and plug the end into the AUX PORT on the opposite side of the instrument.

4.10.If installing the switch on a TURBO analyzer, proceed to 6, if not proceed to 5.

GE Analytical Instruments, Inc. 2005H

Page 2 of 16

DIN 30001 Rev. E

 

 

TOC,FLOW SWITCH UPGRADE 2.12CBI