GEH-6639
Chapter 3 - SELECTION OF THE CS300 CONVERTER
The CS300 converter has to be chosen so that the sum of the inverter
3.1 DIP-SWITCHES AND JUMPER
On R-SM3-L card
Selection of the delay for thyristor disabling during mains dip. | |
Selection of the undervoltage threshold. | |
Selection of the capacitors precharge time | |
S4 - S5 | Selection of the AC mains frequency: 50 or 60 Hz |
CV | Selection of the ML signal function |
3.2 USE OF S1 SWITCH
Relevant only for limited application cases
If the system functioning allows a limited dip voltage value of the
The disadvantage of such function is obviously the presence of a high current inside the CS300 once the voltage is restored. For this reason it is necessary to take appropriate countermeasures by checking the decreasing slope of the
Example:
Calculate the maximum “mains dip” bearable by a converter size 185A, whose mains choke has the following values: 0.148mH 173 rated A and 350A of saturation current. The converter supplies 8 inverters AV300- 3011 (the internal capacitors value of each inverter is equal to 470∝ F); using an oscilloscope, it has been stated that during a normal functioning, in case of a mains dip, the
The aim is to state whether such “mains dip” can be overcome without the precharging phase.
Considering a series resistance (sum of the capacitor parasite drag and of the connection contact resistances) equal to 100mOHM (0.1 OHM), act as following:
DATA: | R = 0.1 W | C = 3760 mF |
| L = 0.14 mH | e = 2.718 |
| V = 70V |
|
16——————— INSTRUCTION MANUAL