Installation Preparation
Preparation WITH an Accessory Storage Drawer
NOTE: MODEL ZSC2202 CANNOT BE INSTALLED WITH AN ACCESSORY STORAGE DRAWER. SEE INSTALLATION PREPARATION WITHOUT AN ACCESSORY STORAGE DRAWER FOR THIS MODEL.
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram Oven:
PREPARE THE OPENING (CONT.)
Installation over a GE/Monogram Oven and Warming Drawer:
30”23-1/2”
Min.*
21”
Min.
Construct Solid Bottom Min. 3/8” Plywood Supported by 2x4 or 2x2 Runners all Four Sides
2” Min.
(3” recommended)
Per Oven
Requirement
|
|
| Construct Solid |
| 30” | Bottom Min. | |
|
|
| 3/8” Plywood |
|
|
| Supported by |
|
|
| 2x4 or 2x2 |
|
| Runners all | |
|
| Four Sides | |
|
| Min.* |
|
|
| 21” | 2” Min. |
|
|
| (3” recommended) |
|
|
| Per Oven |
|
|
| Requirement |
|
| 2” Min. | |
|
|
| |
Min. | Per warming drawer requirement | ||
|
*For existing cutouts, a maximum width of
•If you are replacing a GE/Monogram electric double oven with the combined installation of an Advantium 240V and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2” minimum shown.
*For existing cutouts, a maximum width of
NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details.
CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate
8