GE Monogram 5800 Series Essential Elements Ordering Overview, Replacement of Existing Chassis

Models: 3900 Series 2900 Series 5800 Series

1 60
Download 60 pages 62.88 Kb
Page 43
Image 43
Essential Elements Ordering Overview

Essential Elements Ordering Overview

230/208-volt line-cord connected units — order line cord kit.

230/208-volt sub-base connected units — order sub-base (includes power connection kit) and junction box for chassis.

265-volt units — order sub-base and power connection kit separately.

Electrical Wiring Information – 2900/3900/5800 Series

All Zonelines are single-phase 60 hertz units.

For all installations, the feeder, sub-feeder, branch circuit and electrical protective devices and selection must conform to the National Electrical Code and to local codes.

Maximum connected load in amperes, including demands for the electric heater and the fan motor, are shown on page

44.Branch circuit ampacity and electrical protective device sizing are shown on page 42 for 230/208-volt units and on this page for 265-volt units.

More than one unit per branch circuit is not recommended. When in doubt, consult the National Electrical Code. All wiring, including installation of receptacle, must conform to local electrical regulations and codes.

Replacement of Existing Chassis

230/208-Volt and 265-Volt Units

There have been changes to NEC and improvements and modifications to the Zoneline chassis and sub-bases since the unit was first introduced. Some of these changes require alterations to be made when replacing an older unit with a new chassis.

Line-Cord Connected Units

The plug configuration of new line cord connected units complies with the current NEC standards. Older installations may have wall receptacles that conformed to NEC standards at the time the building was constructed and may not match the configuration of the plug on the new line cord. The recommended solution is to change the wall receptacle to conform to current standard plug configuration. See chart on this page for current receptacle configuration.

ge.com

Permanent Connected Units With Sub-Base

If the existing unit is connected to a sub-base the installation of the new unit may involve modifying the existing installation slightly. It is recommended these modifications be made by a qualified electrician.

If the existing sub-base is the full width of the wall case, RAK201 sub-base access plate may be ordered and used to replace the cover on the old sub-base. Field-supplied wiring, conduit and conduit connectors should be used to make a connection between the new chassis and the center knockout of the RAK201. The wiring connections should be made inside the sub-base and the RAK201 attached to the sub-base with the two screws provided.

If the existing sub-base is not the full width of the wall case, the electrician will have to modify the existing cover plate to allow field-supplied wiring, conduit and conduit connectors to be run from the permanent connection kit to the sub-base.

Enclosure cover removed.

RAK4002A

Wiring harness can be ordered separately as RAK4002CW.

Receptacle

Type

Mfg

Part No

Configuration

 

 

 

 

 

 

 

 

15 AMP

Hubbell

5661

 

 

 

 

 

Typical Line Cord Power Connection Kit RAK3203 shown

58"

21"

Inside

Maximum Cord Extension

Tandem

P&S

5661

 

 

 

 

 

NEMA6-15R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20 AMP

Hubbell

5461

 

 

 

 

 

 

 

 

 

 

Perpendicular

 

 

 

 

 

P&S

5871

 

 

 

 

 

NEMA6-20R

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30 AMP

Hubbell

9330

 

 

 

 

 

Large Tandem

 

 

 

 

 

P&S

5930

 

 

 

 

 

NEMA6-30R

 

 

 

 

 

 

 

 

 

 

 

 

43

Page 43
Image 43
GE Monogram 5800 Series Essential Elements Ordering Overview, Replacement of Existing Chassis, Line-CordConnected Units