GE Monogram ZXR8510 Installation Preparation, Before You Begin, Contents, Proper Installation

Models: ZXR8510 ZXR858 ZXR859

1 12
Download 12 pages 21.4 Kb
Page 2
Image 2
Installation Preparation

Installation Preparation

BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT – Save these instructions for local inspector’s use.

IMPORTANT – Observe all governing codes and ordinances.

Note to Installer – Be sure to leave these instructions with the Consumer.

Note to Consumer – Keep these instructions with your Owner’s Manual for future reference.

Skill Level – Installation of this appliance requires basic mechanical and electrical skills.

Completion time – 1 to 3 hours.

Proper installation is the responsibility of the installer.

Product failure due to improper installation is not covered under the Warranty.

For Monogram local service in your area, 1.800.444.1845.

For Monogram service in Canada, call 1.888.880.3030.

For Monogram Parts and Accessories, call 1.800.626.2002.

CAUTION:

Due to the weight and size of this vent hood and to reduce the risk of personal injury or damage to the product, TWO PEOPLE ARE REQUIRED FOR

PROPER INSTALLATION.

WARNING: The improper connection of the equipment-grounding conductor can result in a risk of electric shock. Check with a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded.

WARNING:

TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY TO PERSONS, OBSERVE THE FOLLOWING:

A. Use this unit only in the manner intended by the manufacturer. If you have any questions, contact the manufacturer.

B. Before servicing or cleaning unit, switch power off at the service panel and lock service panel to prevent power from being switched on accidentally. If the service panel cannot be locked, fasten a tag or prominent warning label to the panel.

For general ventilating use only. Do not use to exhaust hazardous or explosive materials or vapors.

Structural framing, installation work and electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards, including fire-rated construction.

Sufficient air is needed for proper combustion and exhausting of gases through the flue (chimney) of fuel burning equipment to prevent back drafting.

Follow the heating equipment manufacturer’s guidelines and safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE), and the local code authorities.

Local codes vary. Installation electrical connections and grounding must comply with applicable codes. In the absence of local codes, the vent should be installed in accordance with National Electrical Code ANSI/NFPA 70-1990 or latest edition.

CONTENTS

 

Installation Instructions

 

Installation Preparation

 

Step 1,

Mount Template

6

 

Step 2,

Install Upper Support Frame

7

Required Accessories

3

Step 3,

Install Lower Support Frame

7

Product Dimensions

3

Step 4,

Secure Wiring

8

Duct Cover Accessories

4

Step 5,

Size and Install Ductwork

8

Power Supply

4

Step 6,

Install Decorative Duct Covers

9

Tools and Materials Required

4

Step 7,

Install Hood

10

Remove Packaging, Check Contents

5

Step 8,

Connect Electrical

10

Install Ceiling Support

6

Step 9,

Slide Duct Covers Down,

 

 

 

 

 

 

 

Install Utility Bars

11

 

 

Step 10, Install Filters

11

 

 

Step 11, Finalize Installation

11

2

Page 2
Image 2
GE Monogram ZXR8510 Installation Preparation, Before You Begin, Contents, Read these instructions completely and carefully