Installation Instructions
4 SECURE WIRING
•Route house wiring through the ceiling hole and
pull a length to reach the hood junction box, approximately 6″ below the support.
Ceiling
Front Side
Support
Frames
Tape
House
Wiring
•Tape the wire to the front of the frame support to prevent damage during installation and service.
5 SIZE AND INSTALL DUCTWORK
•Measure from top duct connector (Dim. A) to bottom of support frame.
–Add at least 1″ for duct overlap at the top.
–Subtract
•Cut the 6″ dia. duct to the required length.
Ceiling
Duct Connector |
| |
Side |
| |
View |
| |
Support | Required | |
Frame | ||
Duct | ||
Dim. A Duct | ||
| Length |
Duct Connection
To Hood
Bottom Support
Frame Flange
Note: The top and bottom of the duct are external (female) connections. The bottom end should be flared slightly, to facilitate installation of the hood.
•Install duct up through support frames onto the top duct connector. Push duct up until it is
the bottom of support frame flange. See illustration.
8