GE Monogram ZXR859, ZXR858 Install Ceiling Support Structure, Mount Template, Finish the Ceiling

Models: ZXR8510 ZXR858 ZXR859

1 12
Download 12 pages 21.4 Kb
Page 6
Image 6
INSTALL CEILING
Front of Hood

Installation Preparation

INSTALL CEILING

SUPPORT STRUCTURE

At the hood location, install 2 x 4 cross framing between ceiling joists as shown.

The 2 x 4 cross framing can be installed standing or flat. See illustration.

8-3/4" Top View of Support Framing

Cross

Framing

*7-5/8"

16"

Joist

 

Typical Support Frame Mounting

The framing should be spaced 8-5/8” on the sides and 7-5/8” at the front from centerline to centerline to accept mounting screws in the vent support frame.

Cross

Framing

Ceiling

Finish the Ceiling8-3/4"1 MOUNT TEMPLATE

Front of

Hood

Side

ViewSupport

Frame

Note: The cross framing must be spaced 8-3/4" on the side from centerline to centerline in order to accept the hood mounting screws.

Arrange cross framing in the ceiling to suit the existing structure. See examples.

Secure each 2 x 4 block with at least four (4), #10 wood screws, 3″ long (minimum size screws, not

supplied). Use 8 wood screws total for the two supports.

The cross framing must be accurately aligned to assure correct positioning of the hood.

The cross framing must be level in all directions. Check with a spirit level and adjust if necessary.

Cross Framing

Ceiling

8-3/4"

Joist Manual background 7-5/8"Manual backgroundManual backgroundManual background

 

 

Support

Upper Half

 

Frame

Front

Opening

Of Support

 

Frame

of

 

 

Hood

 

Height

Adjustment

Slot

IMPORTANT: The ceiling structure must be capable of supporting the weight of the hood (approximately 100 pounds) and any inadvertent user contact loads. It is recommended that the hood support frame be supported by a minimum of 2 x 4 cross framing.

Finish the Ceiling

Once the ceiling is finished, mark the location of the ceiling joist and cross framing.

Check to be sure that ceiling is level, use shims if necessary.

1 MOUNT TEMPLATE

Align the template with the marks on the ceiling and tape in place.

Be sure the template is oriented correctly, with the front of the hood.

Use a plumb to be sure the mounting holes will provide parallel alignment with the countertop below.

Center punch all hole locations.

Drill pilot holes in the 4 screw locations. Use a 5/32″ bit and drill approximately 1-1/2″

deep.

Cut wire access hole

approximately 1″ dia.

Wire Access Hole

6

Page 6
Image 6
GE Monogram ZXR859, ZXR858 Install Ceiling Support Structure, Mount Template, Finish the Ceiling, Installation Preparation