GE Monogram ZXR858, ZXR859, ZXR8510 Installation Instructions, Install Upper Support Frame

Models: ZXR8510 ZXR858 ZXR859

1 12
Download 12 pages 21.4 Kb
Page 7
Image 7
Installation Instructions

Installation Instructions

2 INSTALL UPPER SUPPORT FRAME

Install the plastic upper duct connector to the upper support frame by inserting from the bottom and snapping into the opening of the air deflector (already installed).

Secure the upper support frame to the ceiling joists and/or cross framing with the 4 screws provided. For maximum rigidity and strength, the screws must be driven into the center of the joists and/or cross framing.

Check to be sure the support frame is level, vertically and horizontally.

3 INSTALL LOWER SUPPORT FRAME

Insert lower support frame (from required accessory ZXR858, ZXR859 or ZXR8510) into the upper support frame and loosely secure with 8 screws and washers (4 on the front and 4 on the back sides).

Adjust the lower support frame up or down to the desired height above the countertop. Tighten screws.

Hood

Lower Support

Mounting

 

Flange

 

 

13-5/8

 

*39-1/8"

Upper

Support Front

Frame Of

Hood

Lower

Support

Frame

Air

Deflector

Plastic Upper Duct Connector

Support

Frame

Opening

Check Level in Both Direction

25-1/2" Recommended

**75-1/8"

to Floor

Countertop

*Note: 39-1/8” to top of hood flange can be increased up to 42” max.

**75-1/8” min to floor, 77-7/8” max.

Important: Again, check to be sure the support is level in both directions. There is no way to level the hood after the hood is secured to the frame.

7

Page 7
Image 7
GE Monogram ZXR858, ZXR859, ZXR8510 Installation Instructions, Install Upper Support Frame, Install Lower Support Frame