Section 3 — Operation

Air-cooled 8.5 kW Generator

3.1 BREAK-IN PROCEDURE

￿ 3.2.3 “MANUAL” POSITION

Once the unit has been installed and all electrical checks have been made, it is strongly recommended that the following “Break-in Procedure” be completed to ensure correct generator operation in the future.

1.

Set the generator’s Auto/Off/Manual switch to

 

AUTO.

2.

Turn OFF the utility power supply to the transfer

Set the switch to MANUAL to crank and start the engine. Transfer to standby power will not occur unless there is a utility failure.

Figure 3.1 – Generator Control Panel

 

switch using the means provided (such as a utili-

 

ty main line circuit breaker).

3.

The unit will start, and the transfer switch will

 

transfer to standby.

4.

Using the transfer switch’s built-in emergency

 

load center, turn on circuits to load the generator

 

to approximately 25% rated load and run the unit

 

for one hour.

5.

Run the unit for one hour at 50% rated load.

6.

Run the unit for one hour at 75% rated load.

7.

Run the unit for one hour at 100% rated load.

FUSE

 

5A

OFF MAN.

AUTO

FUSE

 

15A

SET

 

EXERCISE

 

TIME

L o c a t e y o u r n e a r e s t d e a le r a t :

POWER SYSTEMS, INC.

SYSTEM SET

LOW OIL

HIGH TEMP.

OVER SPEED

OVER CRANK

F L A S H IN G G R E E N L E D =

N O U T IL IT Y S E N S E 4 F L A S H IN G R E D L E D S =

E X E R C IS E R N O T S E T

8.

Turn ON the utility power supply to the transfer

 

switch, which will allow the transfer switch to

 

transfer back to utility power. The unit will con-

 

tinue to run for one minute and then shut down.

9.

Allow the unit to cool.

10.

Drain the oil and remove the oil filter. Replace the

 

oil filter according to Section 4.4, “Changing the

 

Oil Filter” (Page 16). Replace the oil with synthet-

 

ic oil as recommended in Section 4.3, “Changing

 

the Engine Oil” (Page 15).

11.

The generator is now ready for service.

With the switch set to AUTO, the engine may

!crank and start at any time without warning. Such automatic starting normally occurs when utility power source voltage drops below a pre- set level or during the normal exercise cycle. To prevent possible injury that might be caused by such sudden starts, always set the switch to OFF and remove the fuse before working on or around the generator or transfer switch. Then, place a “Do Not Operate” tag on the generator panel and on the transfer switch.

3.2USING THE AUTO/OFF/MANUAL SWITCH (FIGURE 3.1)

￿3.2.1 “AUTO” POSITION

Selecting this switch position activates fully automatic system operation. It also allows you to start and exercise the engine every seven days with the setting of the exer- cise timer (see Section 3.6, Page 14). This position also is used for remote starting, when it is set up.

￿3.2.2 “OFF” POSITION

This switch position shuts down the engine. This position also prevents automatic operation.

3.3AUTOMATIC TRANSFER

OPERATION

To select automatic operation, do the following:

1.Make sure the transfer switch main contacts are set to their “Utility” position, i.e., loads connected to the utility power source (Figure 3.2, Page 14).

2.Be sure that normal utility power source voltage is available to transfer switch terminal lugs N1 and N2.

3.Set the generator’s Auto/Off/Manual switch to AUTO.

4.Set the generator’s main circuit breaker to its ON (or closed) position.

With the preceding steps complete, the generator will start automatically when utility source voltage drops below a preset level. After the unit starts, loads are transferred to the standby power source. Refer to “Sequence of Automatic Operation” (Page 14).

Generac® Power Systems, Inc. 13

Page 15
Image 15
Generac 004692-0 owner manual BREAK-IN Procedure, Automatic Transfer Operation, Manual Position, Auto Position