Operator's Manual | Second Edition· Fifth Printing |
|
|
|
|
Pre-operation Inspection
Do Not Operate Unless:
You learn and practice the principles of safe machine operation contained in this operator's manual.
1Avoid hazardous situations.
2Always perform a
Know and understand the above principles before going on to the next section.
3Always perform function tests prior to use.
4Inspect the work place.
5Only use the machine as it was intended.
Fundamentals
It is the responsibility of the operator to perform a
The
The
Refer to the list on the next page and check each of the items and locations for modifications, damage or loose or missing parts.
A damaged or modified machine must never be used. If damage or any variation from factory delivered condition is discovered, the machine must be tagged and removed from service.
Repairs to the machine may only be made by a qualified service technician, according to the manufacturer's specifications. After repairs are completed, the operator must perform a
Scheduled maintenance inspections shall be performed by qualified service technicians, according to the manufacturer's specifications and the requirements listed in the responsibilities manual.
10 | Genie | Part No. 43650 |