Pre-operation Inspection

Second Edition • Ninth Printing

Operator's Manual

 

 

 

 

Pre-operation Inspection

!Be sure that the operator's, safety and responsibilities manuals are complete, legible and in the storage container located on the platform.

!Be sure that all decals are legible and in place. See Decals section.

!Check for hydraulic oil leaks and proper oil level. Add oil if needed. See Maintenance section.

!Check for battery fluid leaks and proper fluid level. Add distilled water if needed. See Maintenance section.

Check the following components or areas for damage, modifications and improperly installed or missing parts:

!Electrical components, wiring and electrical cables

!Hydraulic power unit, tank, hoses, fittings, cylinders and manifolds

!Drive and turntable motors and drive hubs

!Boom wear pads

!Tires and wheels

!Limit switches, alarms and horn

!Nuts, bolts and other fasteners

!Platform entry mid-rail bar or gate

PRE-OPERATION INSPECTION

Check entire machine for:

!Crack in welds or structural components

!Dents or damage to machine

!Be sure that all structural and other critical components are present and all associated fasteners and pins are in place and properly tightened.

!Be sure that both battery packs are in place, latched and properly connected.

!After you complete your inspection, be sure that all compartment covers are in place and latched.