SECTION 5 – PROGRAMMING THE SYSTEM

5.1 Setting Generator Size

If PowerPause™ Load Management Modules are not installed, dial should be set to 25Kw. (Factory default setting is 25Kw).

NOTE: Setting dial to 25Kw disables all power management functions even if PowerPause™ Load Management

Modules are installed.

If any PowerPause™ Load Management modules are installed and connected to manage loads, the generator size needs to be set for proper operation. Referring to your generator Installation and Owners Manuals, determine the net output of the generator (in Kw) accounting for fuel type, altitude, relative humidity and any other manufacture’s suggested derating adjustments. If the net generator output exceeds 25Kw and PowerPause™ Load Management modules are installed and connected to manage loads, set GENERATOR SIZE to 22.5Kw.

To set the generator size on the OVATION™ Series ATS, locate the GENERATOR SIZE dial on the User Display and using the small straight blade screwdriver provided, rotate the dial arrow to the desired size, from 7 to 22.5Kw, rounding down to not exceed the derated generator output. For example, if you determine that the derated generator output is 19.5 Kw, set the GENERATOR SIZE dial to the next SMALLEST rating, 19Kw. See Figure 5.1.

Improperly setting the GENERATOR SIZE can permanently damage the generator, transfer switch and loads connected to the transfer switch.

5.2 Setting Generator Exercise Schedule and Transfer Option

 

Table 5.2

Each OVATION™ Series ATS has a generator exercise timer that will start and exercise the generator

 

 

 

DIAL NAME

MODEL

at 0, 7, 14, or 28 day intervals (factory setting is 7 days). The transfer switch can also be programmed

to transfer loads to the generator during generator exercise (factory setting is NO load transfer). The

 

NUMBER

exercise cycle will last for approximately 15 minutes. If a utility power failure occurs during the

 

 

101

ATS1001D

exercise cycle, the OVATION™ Series ATS will abort the generator exercise routine within 5 seconds,

and transfer the load to generator power.

 

ATS1001R

To set generator exercise schedule to a setting other than the 7 days default, determine the

 

 

201

ATS2001D

OVATION™ Series ATS model on the User Display where labeled “GENERATOR EXERCISE SCHEDULE”

 

ATS2001R

and use provided small, straight blade screwdriver to rotate the dial to the desired schedule. See

 

 

Table 5.2 to determine model. Once set, the OVATION™ Series ATS will initiate a generator exercise

202

ATS2002R

0, 7, 14 or 28 days from the exact time and day the dial is set. (See Figure 5.1) It is important to set

 

 

the GENERATOR EXERCISE SCHEDULE at the exact day and time you want the generator exercise procedure to occur. For example, if you set the GENERATOR EXERCISE SCHEDULE dial to 14 on Thursday at 2:00 p.m., the OVATION™ ATS will initiate a generator exercise at 2:00 p.m. on a Thursday, 14 days later. To change the time and day the generator exercise occurs, press the RESET button at the desired time and day for the generator exercise to occur.

A “0” setting turns off ALL generator exercising initiated by the transfer switch. DO NOT use the “0” setting unless the generator has a built-in exerciser that will continue to exercise the generator.

If transferring the load during generator exercise is required, on the User Display, press TRANSFER, then immediately press the SERVICE switch. LED 5 flashes once when properly set. To set back to NO transfer during generator exercise, press TRANSFER, then immediately press the SERVICE switch. LED 5 flashes twice when properly reset.

5.3 User Interface Display LEDs

The User Display has five (5) indicator LEDs that display the status of the power sources and loads on the OVATION™ Series ATS:

LED

COLOR

LABEL

IF ON

IF SLOW FLASHING

IF FAST FLASHING

5

RED

GENERATOR LOAD

Load is powered by generator

GEN MAIN circuit breaker error

2+5=service battery

4

RED

GENERATOR POWER

Generator power is within voltage

Generator power out of

Generator start/stop

 

 

 

and frequency specifications

specification

fault

3

YELLOW

LOAD

Power is energizing the Branch

Power source transferring

Motor drive fault

 

 

 

Circuit Breaker Bus

 

 

2

GREEN

UTILITY POWER

Utility power is within voltage and

Utility power out of specification

2+5= battery voltage

 

 

 

frequency specifications

 

below 8VDC

1

GREEN

UTILITY LOAD

Load is powered by utility

UTILITY MAIN circuit breaker error

Bus not powered

Note: LEDs 1, 2 and 3 should be ON when loads are powered by the utility; LEDs 3, 4 and 5 should be ON when loads are powered by the generator.

23

Page 23
Image 23
GenTran ATS1001R, ATS2002R, ATS2001R, ATS2001D, ATS1001D manual Programming the System, Dial Name Model, Number