Mounting to Shop

Floor

Although not required, we recommend that you mount your new machine to the floor. Because this is an optional step and floor materials may vary, floor mounting hardware is not included. Generally, you can either bolt your machine to the floor or mount it on machine mounts. Both options are described below. Whichever option you choose, it is necessary to level your machine with a precision level.

Bolting to Concrete Floors

Anchor studs and lag shield anchors with lag bolts (Figure 7) are two popular methods for anchor- ing an object to a concrete floor. We suggest you research the many options and methods for mounting your machine and choose the best that fits your specific application.

NOTICE

Anchor studs are stronger and more perma- nent alternatives to lag anchors and bolts; however, they will stick out of the floor, which may cause a tripping hazard if you decide to move your machine.

Anchor Stud

Lag Anchor & Bolt

Figure 7. Typical fasteners for mounting to

concrete floors.

G0641 Double Miter Saw

Using Machine Mounts

Using machine mounts, shown in Figure 8, gives the advantage of fast leveling and vibration reduc- tion. The large size of the foot pads distributes the weight of the machine to reduce strain on the floor.

Figure 8. Machine mount example.

NOTICE

We strongly recommend securing your machine to the floor if it is hardwired to the power source. Consult with your electrician to ensure compliance with local codes.