SECTION 6: MAINTENANCE
Always disconnect power to the machine before performing maintenance. Failure to do this may result in serious person- al injury.
Schedule
For optimum performance from your machine, follow this maintenance schedule and refer to any specific instructions given in this section.
Daily Check:
•Drill press is completely powered down at the end of use.
•Excess cutting fluids and chips have been removed and unpainted surfaces are dry and protected.
•Floor mounting bolts are secure.
•Drill press is clean and lubricated.
•Examine wiring for damage or wear.
•Check for any other unsafe condition.
Unpainted Cast Iron
Protect the unpainted cast iron surfaces on the table by removing vises and fixtures daily and by wiping the table clean after every use.
Keep tables
Lubrication
The quill and table use a rack and pinion assem- bly for movement. To ensure a smooth operation and a long life of these rack and pinion systems, lubricate as needed depending upon use.
Brush a small amount of
Figure 28. Table rack lubrication point.
Figure 29. Quill rack lubrication point.
Note: All other bearings are lubricated and sealed at the factory, and do not need further lubrica- tion.