GTO UL325 SERIES installation manual IMPORTANT Deailed Wire Routing Diagrams

Models: UL325 SERIES

1 45
Download 45 pages 5.68 Kb
Page 24
Image 24
IMPORTANT: Deailed Wire Routing Diagrams

IMPORTANT: Deailed Wire Routing Diagrams

The battery harness wire has an in-line 20 Amp fuse that must be placed inside the opener when connecting the battery to the opener. The il- lustration to the right shows the best placement for the bat- tery harness wire, connector and in-line fuse.

ON/OFF

Manual background Receiver Wire

 

F

/OF

ON

 

Battery Harness Wire

Battery Harness

In-Line 20 Amp Fuse

(included)

20

Battery Harness

Connectors

The wires from the battery harness, receiver, transformer or solar panel, and any accessories that have been installed must be routed down the sides of the opener and flatly out the strain relief slot in the back of the opener.

It is IMPORTANT that the wires lay flat and run inside the routing pins at the back of the opener and out the strain relief slot without being pinched when the control board access cover is replaced. See the illustrations to the right and below.

To avoid stripping screw holes - tightening screws by hand with a hand held screwdriver is recommended.

Strain Relief Slot

If you have any questions please call GTO Technical Service at 1-800-543-1236.

MIghty Mule 350

ON

 

o

 

Wire Routing

 

/OFF

 

 

Routing Pin

Neatly arrange all Manual background wires to lay flat as they come out of the opener.

Battery Harness Wires Manual background

Transformer Wires Manual background

Receiver Wires Manual background

Accessory Wires Manual background

20

Page 24
Image 24
GTO UL325 SERIES installation manual IMPORTANT Deailed Wire Routing Diagrams