GTO UL325 SERIES installation manual Preparing to Activate the System, Check List

Models: UL325 SERIES

1 45
Download 45 pages 5.68 Kb
Page 21
Image 21
Check List

At this stage of the installation, the opener should be installed on the gate and the closed position stop should be in place.

Check List

The gate is plumb, level, and swings smoothly on its hinges.

A plate or support was added for the gate bracket (if necessary).

The opener is level and mounted on the centerline of the gate.

Gate Swings Evenly and Freely

Horizontal Cross Member

Hung Firmly and Plumb

Post Bracket Assembly

 

Single Gate Opener

 

Gate Bracket

 

Power Cable

 

Closed Position Positive Stop Plate

Fence Post Set in Concrete

 

Preparing to Activate the System

In order to have easy access to the control board during the rest of the installation, remove the opener and remount it upside down.

ON/OFF

Switch

Bottom

Access Panel

O

OF

N

F

 

IMPORTANT:

Return the opener arm to the upright position when installation is complete to prevent water damage to the control board.

17

Page 21
Image 21
GTO UL325 SERIES installation manual Preparing to Activate the System, Check List