At this stage of the installation, the opener should be installed on the gate and the closed position stop should be in place.
Check List
•The gate is plumb, level, and swings smoothly on its hinges.
•A plate or support was added for the gate bracket (if necessary).
•The opener is level and mounted on the centerline of the gate.
Gate Swings Evenly and Freely | Horizontal Cross Member |
Hung Firmly and Plumb | |
Post Bracket Assembly |
|
Single Gate Opener |
|
Gate Bracket |
|
Power Cable |
|
Closed Position Positive Stop Plate | |
Fence Post Set in Concrete |
|
Preparing to Activate the System
In order to have easy access to the control board during the rest of the installation, remove the opener and remount it upside down.
ON/OFF
Switch
Bottom
Access Panel
O | OF | |
N | ||
F | ||
|
IMPORTANT:
Return the opener arm to the upright position when installation is complete to prevent water damage to the control board.
17