SECTION 1.6

OPERATING INSTRUCTIONS

PART 1

GENERAL INFORMATION

7.Set the generator main line circuit breaker to its "On" or "Closed" position. The generator now powers the electrical loads.

MANUAL SHUTDOWN AND RETRANSFER

BACK TO "UTILITY"

To shut the generator down and retransfer electrical loads back to the UTILITY position, proceed as follows:

1.Set the generator main line circuit breaker to its OFF or "Open" position.

2.Let the generator run at no-load for a few minutes, to cool.

3.Set the generator AUTO-OFF-MANUAL switch to OFF. Wait for the engine to come to a complete stop.

4.Turn off the utility power supply to the transfer switch using whatever means provided (such as a utility source main line circuit breaker)

5.Manually actuate the prepackaged transfer switch to its UTILITY source side, i.e., load connected to the utility source.

6.Turn on the utility power supply to the transfer switch, using whatever means provided.

7.Set the generator AUTO-OFF-MANUAL switch to AUTO.

Page 1.6-3

Page 23
Image 23
Guardian Technologies 4758, 4456, 4390, 4389, 4760, 4759 manual Manual Shutdown and Retransfer Back to Utility