A CAUTION

This equipment is compatible with most water based materials. See the wetted parts in the Tech- nical Data section and your fluid and solvent manufacturer’s compatibility information.

Do not use catalyzed materials in heated applica- tions.

I.Preparing the Operator

All persons who operate the system should be trained in the safe, efficient operation of all system compo- nents as well as the proper handling of the chemical coating. At a minimum, all operators should thoroughly read the safety, installation, and operation sections of this manual and the component manuals.

II.Preparing the Site

1 . Use at least a 5 HP (3.7 Kw) air compressor for efficient operation.

K E Y

Components you must supply:

ABleed-type master air valve Required for pump; order part no. 11 O-223, l/4” nptQ

B

Air

filter.

 

 

Order part no. 11 O - l 46, l/4

npt(f)

C

Air

supply line

 

D

Grounded 5 gallon metal pail

--

E

Air line moisture trap

 

Components supplied with package:

1Husky 307 pump

2G700N air spray gun

3Fluid heater

6 a Pump air regulator

6 b Gun air regulator

1 0 Whip hose

1 3 Drain hose

4 2 l/4” female quick

. disconnect coupler

4 3 Pump ground wire

4 4 Fluid regulator

4 5 Fluid filter

4 8 Filter drain valve

5 4 a Gun fluid hoses

5 4 b Gun air hose

5 8 T i e s t r a p

Fig. 1

2 . Clear obstacles and debris that could cause an unsafe operating environment.

3 . Bring an air line from your compressed air supply to the pump location. Be sure the air is dry and filtered. Install a bleed-type master air valve upstream from the pump. When it is closed and the pump air regulator (6a) is opened, the bleed- type master air valve relieves all air pressure to the system components.

4 . Ventilate the spray booth.

To prevent hazardous concentrations of toxic and/ or flammable vapors, spray only in a properly venti- lated spray booth. Never operate the spray gun

~unless ventilation fans are operating.

Check and follow all of the national, state, and local codes regarding air exhaust velocity requirements.

/’

I-

4 308-448

Page 5
Image 5
Haier 237410 manual Preparing the Operator, II. Preparing the Site