Installation Procedure

(For series 142, 182 )

Check whether indoor unit is horizontal with leveler or polythene pipe filled with water , and check that the dimension of the ceiling opening is correct. Take off the lever gauge before install the ornament panel.

Fasten the screws to make the height difference between the two sides of indoor unit less than 5mm.

First fix it with screws temporally.

Fasten the two temporally fixing screws and other two, and tighten the four screws.

Connect the wires of synchro-motor. Connect the wire of signal.

If no response of remote controller,

 

check whether the wiring is correct,

 

restart remote controller 10 seconds

 

after shut off power supply.

Electric control box

 

(For series 142, 182 )

POWER SUPPLY: 1PH,220-230V~,50Hz

INDOOR UNIT

1

2

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMINAL BLOCK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OUTDOOR UNIT

1

2

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TERMINAL BLOCK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L N

<Limits of panel board installation>

Install the panel board in the direction shown in the figure. The incorrect direction will result in water leakage, meanwhile swing and signal receiving are displayed that cannot be connected.

24

Page 26
Image 26
Haier AB142ACERA, AB422ACERA, AB142ACEAA operation manual Limits of panel board installation