3. Identify the Left Upright (88), which is marked | 3 |
|
|
|
| Wire Tie |
with a “Left” sticker. Have a second person hold |
|
|
| 77 | ||
the Left Upright near the Base (91). |
|
|
|
| 88 | |
See the inset drawing. Tie the wire tie in the |
|
|
|
|
| |
Left Upright (88) securely around the Upright |
|
|
|
|
| 77 |
Wire (77) about 8 in. (20 cm) down from the |
|
|
|
|
| |
end. Then, pull the other end of the wire tie until |
|
|
|
|
|
|
the Upright Wire is routed completely through |
|
|
|
| Wire |
|
the Left Upright. Note: The Upright Wire should |
|
|
|
|
| |
bend so that the connectors are pointing down- |
|
|
|
| Tie |
|
ward. |
|
|
|
|
|
|
|
| 88 |
|
|
|
|
|
|
|
|
| 77 | 91 |
4. Hold the Left Upright (88) against the Base | 4 |
|
|
|
|
|
(91). Be careful not to pinch the Upright |
|
|
|
|
| |
Wire (77) or the Ground Wire (90). Insert two |
|
|
|
|
|
|
3/8" x 2 3/4" Patch Screws (7) and two 3/8" x |
|
|
|
|
|
|
1 1/4" Patch Screws (8) with two 3/8" Star |
|
|
|
|
| 88 |
Washers (13) into the Left Upright. |
|
|
|
|
| |
Partially tighten the 3/8" x 2 3/4" Patch Screws |
|
|
|
|
|
|
(7) and the 3/8" x 1 1/4" Patch Screws (8) until |
|
|
|
|
|
|
the heads of the Patch Screws touch the Left |
|
|
|
|
|
|
Upright (88); do not fully tighten the Patch |
|
|
|
|
|
|
Screws yet. Note: It may be helpful to use the |
|
|
|
|
|
|
Short Hex Key (110) on the Bolt shown. |
|
|
|
|
|
|
Attach the Right Upright (not shown) in the |
|
|
| 7 |
|
|
same way. Note: There are no wires on the |
|
|
|
| 110 | |
right side. |
|
|
|
|
| |
| 8 | 13 |
|
|
|
|
| 77, 90 | 8 | 13 | 91 |
| |
| 8 |
|
|
|
|
|