D. Vent Diagrams
WARNING
Fire Risk. Explosion Risk.
Do NOT pack insulation or other combustibles between ceiling firestops.
•ALWAYS maintain specified clearances around venting and firestop systems.
•Install wall shield and ceiling firestops as specified.
Failure to keep insulation or other material away from vent pipe may cause fire.
1. Top Vent - Horizontal Termination
One Elbow
NOTE: A minimum of 2 feet before the first 90º elbow can be achieved by using a 12 inch section of DVP and the
VT
HT
VT Min. | HT Max. | ||
2 | ft. | 2 | ft. |
|
|
|
|
3 | ft. | 6 | ft. |
|
| ||
4 ft. | 10 ft. | ||
5 ft. | 15 ft. |
VT + HT = 40 ft. Max
Figure 5.3
Two Elbows | H1 | H2 | VT Min. | HT Max. | |||
* | * | 2 | ft. | 2 | ft. | ||
| |||||||
| * | * | 3 | ft. | 6 | ft. | |
| * | * | 4 ft. | 10 ft. | |||
| * | * | 5 ft. | 15 ft. | |||
HT |
| VT + HT = 40 ft. Max. |
|
| |||
*No specific restrictions on this value | |||||||
| EXCEPT VT + HT cannot exceed 40 ft. Max. |
VT
H2H1
Figure 5.4
Heat & Glo • | 13 |