GC150 SERIES DIRECT VENT GAS APPLIANCE
The left Side Log is placed with the short portion of the “Y” into the indent on the Front Log. The long portion of the “Y” leans against the Rear Log and the
leg portion of the Side Log is placed on the side log support (located on the left hand side of the firebox).
The last log to be placed is the Log(Twig). It has a pin cavity in the upper back portion and is placed on the left pin on the Rear Log. The long portion of the Log(Twig) rests on the left Side Log.
Figure 25
Glass Removal
Figure 26
Glass Removal
WARNING!
DO NOT OPERATE THIS APPLIANCE IF THE GLASS IS BROKEN OR CRACKED.
STEP 12 - Positioning the Logs
Open carton labeled #21442 and remove the logs carefully , laying them out as shown in Figure 27. Please note that Figure 27 is the orientation for the logs within the firebox. At this point inspect the logs for any damage.
Begin positioning the logs into the firebox by first plac
The right Side Log should be positioned between the Rear and Front Logs with the short portion of the “Y” up and leaning towards the pilot/ignitor and the indent on the Rear Log. The Middle Log is positioned next and is placed across the Rear and Front Logs. On the upper back of the Middle Log is a pin cavity which is placed on the right hand pin of the Rear Log.
Figure 27
Arranging the Logs
Figure 28
Positioning the Logs
Note: The shading of the logs in this instal- lation manual is for definition only. It does not represent the actual color of the logs
17 | 21322K |