Heatiator NNXT4236IL NNXT3933I E. Vent Diagrams, Top Vent - Horizontal Termination, V1 H1

Models: NNXT4236I NNXT4236IL NNXT3933I NNXT3933IL

1 82
Download 82 pages 55.73 Kb
Page 25
Image 25

E. Vent Diagrams

To replace the first starter elbow with two 45° elbows, refer to Figure 7.4. All other 90° elbows can be replaced with two 45° elbows.

General Rules:

SUBTRACT 3 ft. from the total H measurement for each 90° elbow installed horizontally.

SUBTRACT 1-1/2 ft. from the total H measurement for each 45° elbow installed horizontally.

A maximum of three 90° elbows (or six 45° elbows) may be used in any vent configuration. Some elbows may be installed horizontally. See Figure 7.8.

Elbows may be placed back to back anywhere in the system as long as the first 90° elbow is a starter elbow except as shown in Figure 7.4.

When penetrating a combustible wall, a wall shield firestop must be installed.

When penetrating a combustible ceiling, a ceiling firestop must be installed.

Horizontal runs of vent do not require vertical rise; horizontal runs may be level.

1. Top Vent - Horizontal Termination

One Elbow

V1

H1

V1 min.

V1 max.

H1 max.

ft

m

ft

m

ft

m

0

0.00

-

-

2

0.61

0.33

0.10

-

-

4

1.22

0.5

0.15

-

-

6

1.83

1

0.30

-

-

11

3.35

1.5

0.46

-

-

17

5.18

2

0.61

-

-

17

5.18

DVP

 

25

7.62

17

5.18

SLP

 

23

7.01

17

5.18

You may install the elbow directly on top of the appliance (DVP only).

Figure 7.3

Note: The NNXT series appliances can adapt to SLP series vent pipe when venting off the top of the appliance. You must use a DVP-SLP24 adapter which can only be attached to the appliance starting collar.

When looking at horizontal termination diagrams, the adapter is not counted as part of the minimum vertical (V1 min.) requirements.

Whether horizontal or vertical termination, the adapter is counted as part of the maximum vertical limitations.

All venting rules for the vent run must still be followed.

HORIZONTAL EXAMPLE

V1 = 1 ft.

H1 = 11 ft. max.

DVP

V1 = 1 ft.

H1 = 11 ft.

max

DVP-SLP24

SLP

VERTICAL EXAMPLE

 

 

DVP-SLP24

12 ft (3.66 m) min.

12 ft (3.66 m) min.

Adapter

60 ft (18.29 m) max.

60 ft (18.29 m) max.

 

DVP

SLP

Heatilator • Novus NNXT • 4055-879 • Rev. o • 2/12

25

Page 25
Image 25
Heatiator NNXT4236IL NNXT3933I, NNXT3933IL E. Vent Diagrams, Top Vent - Horizontal Termination, V1 H1, One Elbow