Hobart HBA2E, HBA2G manual Verify Operation of Steam

Models: HBA2G HBA2E

1 32
Download 32 pages 27.2 Kb
Page 30
Image 30
Verify Operation of Steam

3.Verify draft inducer pressure switch (Fig. 15) operation.

A.Set oven control to call for heat make sure convection fan is running.

B.Disconnect tubing from draft inducer pressure switch (Fig. 15), burner flame should go out.

C.Reconnect tubing and burner should establish a flame. If not, contact your local Hobart Bakery Systems service office.

Fig. 15

Verify Operation of Steam

1.Check steam system for proper operation.

A.Turn the water supply on.

B.Turn oven on and set to normal bake temperature.

C.Allow to cycle three times to stabilize temperature.

D.Set control to call for steam.

E.Observe operation. If steam is not observed, contact your local Hobart Bakery Systems service office.

After completion of the owner PM procedure you will need to contact a qualified servicer for any needed repairs.

Keep a copy of the Owner Preventive Maintenance Checklist for your records.

– 30 –

Page 30
Image 30
Hobart HBA2E, HBA2G manual Verify Operation of Steam