.A complete Parts List is available at www.HobartWelders.com
6-5. Torch And Work Cable Connections
| Y Turn Off power source, and | ||
|
| disconnect input power. | |
| If torch or work cable needs to be | ||
| removed or replaced, proceed as | ||
| follows: | ||
8 | 1 | Power Source | |
Remove wrapper from unit. | |||
| |||
| Torch Connections | ||
| Remove existing torch cable from | ||
| unit. | ||
| 2 | Strain Relief | |
| 3 | Torch Cable |
Insert strain relief on end of cable through front panel opening. Slide
5 7 9 6 41 strain relief nut onto torch cable, but do not tighten.
4 Air Line Connector
Install air line connector onto compressor fitting.
5 Plug PLG4/Receptacle RC4
Connect PLG4 to receptacle RC4 on circuit board PC1.
32
6 7
6Female And Male Friction Terminal RC1/ELECTRODE
Connect female friction terminal on end of black lead to RC1/ELECTRODE.
7Female And Male Friction Terminal RC2/TIP
Connect female friction terminal on end of red lead to RC2/TIP.
Tighten strain relief nut.
Tighten strain relief around cable.
| Work Cable Connections |
2 | Remove existing work cable from |
unit. | |
| 8 Strain Relief |
5 | . Be sure to allow some work |
| |
| cable slack inside the unit. |
| Insert strain relief on end of cable |
| through front panel opening. Slide |
| strain relief nut onto work cable and |
| secure strain relief to front panel. |
| 9 Work Lead Male Friction |
| Terminal |
| Connect work clamp lead to male |
| friction terminal labeled WORK on |
| circuit board PC1. |
| Reinstall wrapper. |
Tools Needed:
5/16 in
Ref. 804