Introduction

 

Preferred

Process

Cell Locations

 

 

Pump

Cool er

a/n 23340

Figure 1-2 Recommended Locations for Mounting a Conductivity Cell

*Maximum allowable operating temperature for piping arrangements depends on the type of pipe tee chosen.

Flow

(a) Cell Mounted in 3/4" NPT Pipe Tee* (Customer Supplied)

Flow

(b) Cell Mounted in PES Flow Chamber

a/n 23341

Figure 1-3 Two Piping Arrangements for the Cell

10/07

Installation and Maintenance Manual

3

Page 9
Image 9
Honeywell 4973 Series manual Preferred