
FIRSTVISION Installation Instructions | Enclosure Installation |
2.2 Enclosure Installation
Refer to “LCD Installation” on page 14 if the enclosure is already installed.
NOTE: You can use this information to install the FIRSTVISION enclosure and to make power supply connections to the enclosure’s control board or you can refer to the ONYX®FIRSTVISION™ Enclosure Installation Instructions (P/N 53105).
Use the following information as a guideline to accomplish the installation of the FIRSTVISION enclosure and prepare the power supply components/connections for the FIRSTVISION LCD. Perform all installations in accordance with building construction, local code requirements, and/or as described in the manufacturer’s documentation.
Step 1. Mount the FIRSTVISION enclosure on an inside wall of the building.
Step 1a.Prepare a rough opening in the wall at the location FIRSTVISION will be mounted according to the enclosure’s dimensions specified in Figure 2.1 on page 13).
NOTE: The dimensions shown are the exact measurement of the enclosure. Make the enclosure hole slightly larger (approximately 1/8”) than the enclosure’s dimensions for an easier fit.
Step 1b.Remove the enclosure’s knockout(s) that will be used to route your LAN cable and power supply’s cable through.
Step 1c.Place the enclosure inside of the rough opening (with the LCD hinges on the left).
Step 1d.Attach the enclosure to the wall at the six locations provided using field supplied fasteners.
NOTE: Make sure the enclosure is level before fastening it to the wall.
Mounting Hole (6 places)
Step 2. Mount the external power supply according to the manufacturer’s instructions.
Step 3. Route the external power supply wiring into the enclosure through one of the available knockouts, and then connect it to the control board as shown in Figure 2.2 on page 14.
WARNING: Electrical Panel Breaker Lockout Procedures
Leave electrical panel breaker lockout safety procedures in place until you are ready to install and connect the FIRSTVISION LCD.
NOTE: Adhere to electrical panel breaker lockout safety procedures.
12 | FIRSTVISION™ Installation and Operation Manual - P/N: 53034:Rev: A2 10/29/07 |