FIRSTVISION Installation Instructions

LCD Installation

The FIRSTVISION enclosure is factory assembled and wired to install/connect the LCD.

Enclosure’s Control Board

Power Cable from LCD

J1

P1

+24VDC/3A

Common GND

Enclosure’s

Control Board

LCD Power Cable

 

From Power Supply

Figure 2.2 FIRSTVISION Power Wiring Diagram

WARNING: Electrical Connections

If power is applied to FIRSTVISION for testing your electrical connections, you MUST shut down

FIRSTVISION’s Windows® operating system before turning off the power. See “Make Connections to FIRSTVISION” on page 15 for instructions on using FIRSTVISION like a personal computer, and then follow standard Windows shut-down procedures.

2.3 LCD Installation

Step 1. Install the FIRSTVISION LCD onto the enclosure’s factory installed hinges (LCD hinges on the left).

Step 2. Connect the LCD’s power cable to the enclosure’s control board as shown in Figure 2.2 on page 14.

Step 3. Connect the customer supplied LAN cable to the LAN port as shown in Figure 3.3 on page 16.

Step 4. Swing the LCD closed and fasten it closed by using the 2 factory supplied black pan head machined screws.

Step 5. Close the LCD’s glass paneled door.

Step 6. Use the factory supplied door key to lock the closed door. Step 7. Verify the door locks and unlocks with each turn of the key.

Step 8. You are now ready to perform “Enabling FIRSTVISION to Monitor Your Building” on page 15.

14

FIRSTVISIONInstallation and Operation Manual - P/N: 53034:Rev: A2 10/29/07